混凝土攪拌車廠家如何處理退回的混凝土?

來源:http://www.skar-bnat.com/ 時間:2022-03-30

  由於諸如運輸,泵送,澆注等的各種原因,混凝土首先由油輪驅動器稱重。質量檢查員根據油輪驅動器提供的稱重列表和油輪的皮重列表計算剩餘金額,然後根據相同的等級或較低等級。使用以下處理方法:
  For various reasons such as transportation, pumping, pouring, etc., the concrete is first weighed by the tanker driver. The quality inspector calculates the remaining amount based on the weighing list provided by the tanker driver and the tanker's tare list and then on the same grade or lower grade. Use the following processing methods:
  (1)在同一級別使用。如果延遲時間在2H以內,則與處理後的原始混合比相比,水泥劑量應增加10-15kg/m3,並加入0.1%-0.3%。或直接降低強度水平,並適當地增加調整的混合物量。延遲時間為2至4小時。處理後,水泥劑量應增加20至40kg/m3,並加混合物應增加0.4%至0.6%。或直接減少兩個強度水平,並適當增加調整的混合物的量。
  Use at the same level. If the delay time is less than 2H, the cement dose should be increased by 10-15kg/m3 and added by 0.1-0.3% compared to the original mixture after treatment. Or directly reduce the strength level and appropriately increase the amount of the adjusted mixture. The delay is 2 to 4 hours. After treatment, the cement dose should be increased by 20 to 40kg/m3, and the mixture should be increased by 0.4% to 0.6%. Or simply reduce the two strength levels and appropriately increase the amount of the adjusted mixture.
  (2)使用降級等級的使用必須基於用於降級混凝土和原始級混凝土的相同原料,並且僅適用於C40和C40以下的混凝土。在以上的基礎上,減少一個強度水平進行處理。
  The use of degraded grade must be based on the same raw materials used for degraded and original grade concrete and only apply to concrete below C40 and C40. On the basis of the above, reduce the intensity level for processing.
  (3)延遲時間超過4小時,應報廢或作為非承重低等級混凝土使用。若日平均氣溫在5~20℃範圍內,可按(1)中的情況增加處理0.5h。若日平均氣溫低於5℃,可按(1)增加處理1小時。
  If the delay time exceeds 4 hours, it should be scrapped or used as non-load-bearing low-grade concrete. If the average daily temperature is within the range of 5-20 ℃, the treatment can be increased by 0.5h as shown in (1). If the average daily temperature is less than 5℃, the treatment can be increased by 1 hour according to (1).
  (4)混凝土運往施工現場時,發現混凝土的坍落度達不到施工要求。若坍落度低於設計要求30-50mm,可按運輸清單上的平方數,每側加泵送劑0.5kg。比如貨件體積是8m3,可以加0.5×8=4kg。如果用10kg的塑料桶裝泵送劑,滿桶11kg,大約可以加入桶的2/5,然後用水管加水3-5s,將料鬥中的泵送劑衝入罐,啟動罐快速旋轉3分鍾,上車觀察混凝土拌合物是否合適,符合要求即可使用。
  When concrete is transported to the construction site, it is found that the slump of concrete cannot meet the construction requirements. If the slump is lower than the design requirements of 30-50mm, 0.5kg pumping agent can be added to each side according to the square number on the transportation list. For example, if the shipment volume is 8m3, 0.5×8=4kg can be added. If you use 10kg plastic bucket pumping agent, full bucket 11kg, about 2/5 can be added to the bucket, and then add water 3-5s with water pipe, the pumping agent in the hopper into the tank, start the tank quickly rotate for 3 minutes, get on the car to observe whether the concrete mixture is appropriate, can be used in accordance with the requirements.
  (5)當混凝土送至施工現場等待較長時間才開始使用材料或混凝土使用時間過長撞到柱子,混凝土在卸料槽中不流動時,應先估算罐內混凝土量,然後再估算罐內混凝土量。計算每1kg泵送劑的添加量。加入泵送劑後,按照第(4)條的要求進行加水、快速旋轉、觀察等步驟。當使用部分材料並估計不準確的數量時,低估總比高估好。先少加一點,如果達不到要求,可以再加一點,達到要求。如果一次加入過多的泵送劑量,混凝土拌合物的坍落度太大,混凝土就會緩凝。
  when the concrete is sent to the construction site to wait for a long time before the use of materials or concrete use time is too long to hit the column, concrete in the discharge tank does not flow, should first estimate the amount of concrete in the tank, and then estimate the amount of concrete in the tank. Calculate the amount of pumping agent per 1kg. After the pumping agent is added, water, rapid rotation, observation and other steps shall be carried out in accordance with the requirements of Article (4). When using partial materials and estimating the amount of inaccuracies, it is better to underestimate than to overestimate. Add a little bit less, and if you don't meet the requirements, you can add a little bit more to meet the requirements. If too much pumping dose is added at one time, the concrete mix will slump too much and the concrete will slow down.
  (6)混凝土攪拌車廠家認為)在初凝期的混凝土中,由於溫度高、運輸距離長、壓製時間長,混凝土的坍落度損失比較大。經試驗可添加同類型的泵送劑或減水劑。但添加的總量和之前添加的總量不應超過外加劑最大量的20%。應逐漸添加,先少添加。攪拌後,攪拌車必須快速轉動2分鍾左右,並測量坍落度符合要求。運至現場的混凝土不能立即卸貨,卸貨前應迅速轉動運輸車2分鍾,以保證坍落度和質量。超過初凝時間的混凝土應丟棄,不能重複使用。混凝土攪拌站澆築前的停滯時間越長,混凝土強度損失越嚴重,應引起足夠的重視。
  in the initial setting period of concrete, due to high temperature, long transportation distance, long pressing time, concrete slump loss is relatively large. After the test can add the same type of pumping agent or water reducing agent. But the total amount added and the total amount previously added should not exceed 20% of the maximum amount of the admixture. It should be added gradually and less at first. After mixing, the mixing car must turn quickly for about 2 minutes, and measure slump to meet the requirements. The concrete transported to the site cannot be unloaded immediately. Before unloading, the transport truck should be quickly turned for 2 minutes to ensure slump and quality. Concrete beyond the initial setting time should be discarded, not reused. Concrete mixing station before pouring stagnation time is longer, concrete strength loss is more serious, should cause enough attention.
上一篇:混凝土攪拌車廠家分析設備抱軸問題
下一篇:混凝土攪拌車雨後行駛前後要做什麽工作?
tag:混凝土攪拌車,小型混凝土攪拌車,全自動混凝土攪拌車
當前位置: 首頁 - kaiyun > 行業資訊 >

混凝土攪拌車廠家如何處理退回的混凝土?

作者:中科kaiyun混凝土攪拌車廠家 時間:2022-03-30

  由於諸如運輸,泵送,澆注等的各種原因,混凝土首先由油輪驅動器稱重。質量檢查員根據油輪驅動器提供的稱重列表和油輪的皮重列表計算剩餘金額,然後根據相同的等級或較低等級。使用以下處理方法:
  For various reasons such as transportation, pumping, pouring, etc., the concrete is first weighed by the tanker driver. The quality inspector calculates the remaining amount based on the weighing list provided by the tanker driver and the tanker's tare list and then on the same grade or lower grade. Use the following processing methods:
  (1)在同一級別使用。如果延遲時間在2H以內,則與處理後的原始混合比相比,水泥劑量應增加10-15kg/m3,並加入0.1%-0.3%。或直接降低強度水平,並適當地增加調整的混合物量。延遲時間為2至4小時。處理後,水泥劑量應增加20至40kg/m3,並加混合物應增加0.4%至0.6%。或直接減少兩個強度水平,並適當增加調整的混合物的量。
  Use at the same level. If the delay time is less than 2H, the cement dose should be increased by 10-15kg/m3 and added by 0.1-0.3% compared to the original mixture after treatment. Or directly reduce the strength level and appropriately increase the amount of the adjusted mixture. The delay is 2 to 4 hours. After treatment, the cement dose should be increased by 20 to 40kg/m3, and the mixture should be increased by 0.4% to 0.6%. Or simply reduce the two strength levels and appropriately increase the amount of the adjusted mixture.
  (2)使用降級等級的使用必須基於用於降級混凝土和原始級混凝土的相同原料,並且僅適用於C40和C40以下的混凝土。在以上的基礎上,減少一個強度水平進行處理。
  The use of degraded grade must be based on the same raw materials used for degraded and original grade concrete and only apply to concrete below C40 and C40. On the basis of the above, reduce the intensity level for processing.
  (3)延遲時間超過4小時,應報廢或作為非承重低等級混凝土使用。若日平均氣溫在5~20℃範圍內,可按(1)中的情況增加處理0.5h。若日平均氣溫低於5℃,可按(1)增加處理1小時。
  If the delay time exceeds 4 hours, it should be scrapped or used as non-load-bearing low-grade concrete. If the average daily temperature is within the range of 5-20 ℃, the treatment can be increased by 0.5h as shown in (1). If the average daily temperature is less than 5℃, the treatment can be increased by 1 hour according to (1).
  (4)混凝土運往施工現場時,發現混凝土的坍落度達不到施工要求。若坍落度低於設計要求30-50mm,可按運輸清單上的平方數,每側加泵送劑0.5kg。比如貨件體積是8m3,可以加0.5×8=4kg。如果用10kg的塑料桶裝泵送劑,滿桶11kg,大約可以加入桶的2/5,然後用水管加水3-5s,將料鬥中的泵送劑衝入罐,啟動罐快速旋轉3分鍾,上車觀察混凝土拌合物是否合適,符合要求即可使用。
  When concrete is transported to the construction site, it is found that the slump of concrete cannot meet the construction requirements. If the slump is lower than the design requirements of 30-50mm, 0.5kg pumping agent can be added to each side according to the square number on the transportation list. For example, if the shipment volume is 8m3, 0.5×8=4kg can be added. If you use 10kg plastic bucket pumping agent, full bucket 11kg, about 2/5 can be added to the bucket, and then add water 3-5s with water pipe, the pumping agent in the hopper into the tank, start the tank quickly rotate for 3 minutes, get on the car to observe whether the concrete mixture is appropriate, can be used in accordance with the requirements.
  (5)當混凝土送至施工現場等待較長時間才開始使用材料或混凝土使用時間過長撞到柱子,混凝土在卸料槽中不流動時,應先估算罐內混凝土量,然後再估算罐內混凝土量。計算每1kg泵送劑的添加量。加入泵送劑後,按照第(4)條的要求進行加水、快速旋轉、觀察等步驟。當使用部分材料並估計不準確的數量時,低估總比高估好。先少加一點,如果達不到要求,可以再加一點,達到要求。如果一次加入過多的泵送劑量,混凝土拌合物的坍落度太大,混凝土就會緩凝。
  when the concrete is sent to the construction site to wait for a long time before the use of materials or concrete use time is too long to hit the column, concrete in the discharge tank does not flow, should first estimate the amount of concrete in the tank, and then estimate the amount of concrete in the tank. Calculate the amount of pumping agent per 1kg. After the pumping agent is added, water, rapid rotation, observation and other steps shall be carried out in accordance with the requirements of Article (4). When using partial materials and estimating the amount of inaccuracies, it is better to underestimate than to overestimate. Add a little bit less, and if you don't meet the requirements, you can add a little bit more to meet the requirements. If too much pumping dose is added at one time, the concrete mix will slump too much and the concrete will slow down.
  (6)混凝土攪拌車廠家認為)在初凝期的混凝土中,由於溫度高、運輸距離長、壓製時間長,混凝土的坍落度損失比較大。經試驗可添加同類型的泵送劑或減水劑。但添加的總量和之前添加的總量不應超過外加劑最大量的20%。應逐漸添加,先少添加。攪拌後,攪拌車必須快速轉動2分鍾左右,並測量坍落度符合要求。運至現場的混凝土不能立即卸貨,卸貨前應迅速轉動運輸車2分鍾,以保證坍落度和質量。超過初凝時間的混凝土應丟棄,不能重複使用。混凝土攪拌站澆築前的停滯時間越長,混凝土強度損失越嚴重,應引起足夠的重視。
  in the initial setting period of concrete, due to high temperature, long transportation distance, long pressing time, concrete slump loss is relatively large. After the test can add the same type of pumping agent or water reducing agent. But the total amount added and the total amount previously added should not exceed 20% of the maximum amount of the admixture. It should be added gradually and less at first. After mixing, the mixing car must turn quickly for about 2 minutes, and measure slump to meet the requirements. The concrete transported to the site cannot be unloaded immediately. Before unloading, the transport truck should be quickly turned for 2 minutes to ensure slump and quality. Concrete beyond the initial setting time should be discarded, not reused. Concrete mixing station before pouring stagnation time is longer, concrete strength loss is more serious, should cause enough attention.